
Diesel Generator Sets
Sixteen engine brands and three enclosure configurations, covering standby, prime and continuous duty. Open, silent or containerised.
When you need power, we get it to you efficiently. We design, assemble and factory-test reliable diesel generator sets for use in data centres, hospitals, industries, mines and marine.
Mines, ports, data halls and hospitals run around the clock — and so must the equipment that keeps them running. Cunmi sets are engineered for prime and continuous duty, not just the occasional outage: sized to your real load profile, rated for high ambient temperatures, and built to be serviced in the field with parts you can actually get.
Explore applicationsEvery set is assembled on the same line, load-tested to ISO 8528 and shipped with a factory test certificate.

Sixteen engine brands and three enclosure configurations, covering standby, prime and continuous duty. Open, silent or containerised.

Containerised power plants built to the Container Safety Convention, with Marine C5 corrosion protection and stainless-steel external panels for platform, vessel and port duty.

Resistive and capacitive load banks for generator load testing, verifying output, voltage, frequency, cooling and protection systems for data centres and factories before delivery.

Efficient natural gas and LPG generator sets delivering reliable, lower-emission power for industrial, commercial and infrastructure applications.
The same engine and alternator, packaged three ways. Start with the site constraint — noise, climate or schedule — and the package follows.
One assembly line and one test regime stand behind both product lines: land-based generator sets and offshore packages.
Standby, prime and continuous-duty diesel sets from 10 kVA to 4,125 kVA, in open, silent or containerised form. Every rating is load-tested to ISO 8528 at 25, 50, 75 and 100 % before dispatch, and Stage V or EPA Tier 4 Final packages are available where emissions rules require them.
Explore generator setsGenerator packages and offshore containers built for salt-laden air and deck transport: Marine C5 corrosion protection, stainless-steel external panels and Container Safety Convention certification, in 10, 20, 30, 40 and 45 ft footprints.
See offshore containersMost generator trouble starts before the set is ever built — an oversized machine that never reaches working temperature, or an undersized one that lives at full load. Our engineers size every package from your load profile, altitude, ambient temperature and duty cycle, then prove it on the load bank before it leaves the works.
Nine industries, nine different duty profiles. Each solution page documents the recommended configuration, the engineering rationale and a reference project.

Tier III / IV standby and N+1 redundant power
Explore solution
Uninterrupted power for critical care
Explore solution
Prime power for drilling, refining and field camps
Explore solution
Reliable site power that moves when you do
Explore solution
Process power for manufacturing plants
Explore solution
Marine-grade power for salt-laden air
Explore solution
Compact, silent power for remote base stations
Explore solution
Quiet, compact power for occupied buildings
Explore solution
Mobile, self-contained power stations
Explore solutionWe own the assembly line, the load-test bay and the after-sales desk. That is what makes a delivery date meaningful.
Assembly, paint and load-test capability under one roof — we build the set, we do not trade it.
Each genset runs a full load bank test at 25 %, 50 %, 75 % and 100 % before packing.
CE marked, with Stage III, Stage V and EPA Tier 4 Final emission lines and DNV survey support for oilfield duty.
Spare-parts hubs and trained partners in more than 50 countries.
Six project stories from recent deployments. Each card links to the full story — the brief, what we supplied and how the plant runs today.

Fourteen containerised sets, one responsible supplier — the campus rides through grid loss without interrupting server load.

Five open-frame sets run continuously at a remote oilfield, serviced inside the planned shutdown window.

Silent sets from 10 to 50 kVA commissioned site by site to the operator’s own boundary noise limit.

Changeover to backup proven against the hospital’s own load profile before handover — not against a lab figure.

Three 250 kVA sets have relocated twice between phases of a 20-month high-rise programme by crane lift.

A C5-coated 200 kVA container set has run two offshore charters in salt air without a recorded fault.
Walk the assembly line in Fujian, watch a set run a full load-bank test at 25, 50, 75 and 100 %, and put your questions to the engineers who signed off the design. Visitors are welcome year-round — we will arrange the schedule around your trip.
Arrange a visit


Product updates, commissioning case studies and technical notes from our engineering and after-sales teams.
Engineers, welders, test technicians and export sales professionals — if you want your work to be measured in megawatts and decades, not sprints, we should talk.
We are hiring across assembly, quality, controls and after-sales in Fujian and Xiamen, and in our overseas parts hubs.
CareersSend us your load profile, ambient conditions and site constraints. A Cunmi sales engineer will come back within one business day with a sized recommendation and budget quotation.