1. Requirements review
We collect the load profile, ambient conditions, noise limits, fuel quality and site constraints in a single specification form.
Power engineered around the duty cycle of your industry — from Tier IV data-centre redundancy to prime-power mining camps and silent hospital standby. Choose the industry you serve below, or start from the enclosure configuration you need; both routes lead to the same engineering.
Nine duty profiles. Each page explains the engineering rationale — load acceptance, redundancy, noise and environment — behind the sets we specify for it.
Tier III / IV standby and N+1 redundant power
Explore application
Uninterrupted power for critical care
Explore application
Prime power for drilling, refining and field camps
Explore application
Reliable site power that moves when you do
Explore application
Process power for manufacturing plants
Explore application
Marine-grade power for salt-laden air
Explore application
Compact, silent power for remote base stations
Explore application
Quiet, compact power for occupied buildings
Explore application
Mobile, self-contained power stations
Explore applicationThe same engine and alternator, packaged three ways. If you already know the enclosure, this is the faster route to ratings and data sheets.
Maximum accessibility, lowest cost per kVA
View the configuration
Weatherproof and acoustic canopy for residential areas
View the configuration
Plug-and-play power in an ISO footprint
View the configurationThe complete generator set, container, load bank and spare-parts catalogue.
Open the catalogueA structured four-stage process that keeps specification, delivery and commissioning under control.
We collect the load profile, ambient conditions, noise limits, fuel quality and site constraints in a single specification form.
We model step-load response, derate for altitude and temperature, and recommend engine, alternator and enclosure.
Each set runs a full load-bank test at 25 %, 50 %, 75 % and 100 % with a signed test certificate.
Site commissioning support, operator training and a regional spare-parts holding for the life of the asset.
Send us the load profile, site conditions and redundancy requirement. A Cunmi sales engineer will come back with a sized recommendation and budget quotation.
I'm ready to proceedSizing, paralleling, noise limits or grid codes — our application engineers answer specification questions before you commit to a configuration.
I have a questionConsumables, long-lead items and overhaul kits for the twenty most common platforms, held in regional hubs and quoted with honest lead times.
I have a service request