+86 151 5922 6809 cunmiwy@gmail.com Mon – Sat, 08:30 – 18:00 (GMT+8) Get a Quote
Rental & Construction

Rental & Construction

Construction sites demand power that arrives quickly, survives rough handling and runs on whatever fuel is available. Cunmi supplies towable, skid and containerised sets built for the rental and contracting market.

The Challenge

Rental & Construction power requirements

Whether it is a tower crane, a concrete batching plant or a temporary site office cluster, the generator has to be sized for the worst-case simultaneous starting scenario and still fit through the site gate.

Our construction packages are available on road-tow trailers with lights, brakes and overrun coupling, or on compact skids that a single telehandler can reposition.

Rental & Construction / Rental & Construction application photo
Recommended Products

Ratings we specify most often for Rental & Construction

Each rating below is a published row from the brand model tables. Open Size range for the full span, or View for the engine and alternator details.

Up to 100 kVA

CM-DZ100

Diesel generator set built around the Deutz BF4M2012C G2 engine, rated to ISO 8528-1.

Standby rating
100 kVA
Prime rating
90 kVA
Engine platform
BF4M2012C G2
Frequency
50 Hz
100 – 500 kVA

CM-PK150

Diesel generator set built around the Perkins 1106A-70TG1 engine, rated to ISO 8528-1.

Standby rating
150 kVA
Prime rating
135 kVA
Engine platform
1106A-70TG1
Frequency
50 Hz
100 – 500 kVA

CM-CU220

Diesel generator set built around the Cummins 6CTAA8.3-G2 engine, rated to ISO 8528-1.

Standby rating
220 kVA
Prime rating
200 kVA
Engine platform
6CTAA8.3-G2
Frequency
50 Hz
Solution Highlights

What makes the difference in this application

Towable and skid options

Road-tow trailers, lifting frames and fork pockets as standard.

Robust enclosures

Zinc-coated, powder-coated steel that survives repeated site moves.

Multi-set paralleling

Link two to eight units for growing site demand without recapitalising.

Rental-ready

Hour meters, remote monitoring and standard fleet service intervals.

How projects are delivered

From load schedule to commissioning in rental & construction

The same three stages run on every order, whatever the configuration: engineering before the quotation, a documented load test before packing, and support after the set is on site.

Engineering and sizing
Step 01

Engineering and sizing

Load schedule, starting currents, ambient and altitude derating are worked through before a rating is proposed — the alternator is sized for the largest step, not the average.

Factory build and load test
Step 02

Factory build and load test

Assembly, wiring and paint in one works, then a four-point load bank run at 25 / 50 / 75 / 100 % with the test sheet serial-numbered to the set.

Shipping, commissioning and support
Step 03

Shipping, commissioning and support

Export packing, documentation and commissioning guidance, with spare-parts supply and remote diagnosis for the life of the installation.

Featured Project

Site power that moves with the build

A 20-month construction programme that needed power able to relocate between phases without re-procurement.

The brief

The contractor needed site power for tower cranes, hoists and site offices across a 20-month programme, with the permanent grid connection only arriving in the final phase.

What we supplied

Three 250 kVA sets on skid frames with external fuel tanks, specified so a crane lift can relocate a set between phases in a single morning.

On site today

The same three sets have moved twice already and are now powering the finishing phase until the permanent supply takes over.

Containerised Cunmi generator sets loaded on a trailer ready for delivery to a construction site project
Units
3 × 250 kVA sets
Duty
Prime power, relocatable
Site
High-rise construction programme
Service
Moved twice between phases
Related Reading

Further reading on Rental & Construction power

Technical articles and product updates relevant to this application.

Ready to buy?

Send us the load profile, site conditions and redundancy requirement. A Cunmi sales engineer will come back with a sized recommendation and budget quotation.

I'm ready to proceed

Have a technical question?

Sizing, paralleling, noise limits or grid codes — our application engineers answer specification questions before you commit to a configuration.

I have a question

Need service or spares?

Consumables, long-lead items and overhaul kits for the twenty most common platforms, held in regional hubs and quoted with honest lead times.

I have a service request